
AIMS Attachment A: AIMS Statement of Work
Page 45 of 130
12. Part 1193 of the Telecommunications Act Accessibility Guidelines:
i www.access-board.gov/telecomm/html/telfinl2.htm#21
13. International Organization For Standardization (ISO):
i ISO 9001; Quality Assurance in Design/Development, Production,
Installation, and Servicing
ii ISO 9003; Quality Assurance in Final Inspection and Test
iii ISO 9004; Quality Management and Quality System Elements
Guidelines
14. International Air Transport Association (IATA):
i IATA RP 1706c; Common Use Self-Service (CUSS)
ii IATA PDF417 2D Bar Code Standard (once established)
15. Software Standards:
i J2EE™, CORBA®, XML, and SOAP (latest version of software
standards at time of first product submittal).
3.2.2 Contractor Submittals
A. All submittals are subject to County approval. Contract submittals shall be
submitted for one round of review and comment by the County. The
CONTRACTOR shall be responsible for incorporating all comments and
resubmitting. If a revised submittal is rejected by the County, additional
review and comment of the submittal shall be conducted by the County at
the CONTRACTOR‟s expense.
B. The delivery dates of submittals will be negotiated unless specified herein.
The CONTRACTOR shall supply any submittal within five (5) County Work
Days if requested by the County.
C. The CONTRACTOR shall provide the following submittals in addition to
those already required throughout the document:
1. Submittal Schedule
2. Detailed Project Schedule as described in Section 2.1.3.
3. System Environmental Requirements: Provide the environmental
specifications for each system component that will be located in an
Airport communications room. This information shall include heat load
documentation, electrical requirements, equipment dimensions and
weight, and any special requirements or limitations of each system
component.
Exhibit 3
Page 105 of 278
Comentários a estes Manuais